TLDRocket
Sign in

Nvidia investing $1.5B in SoftBank data center developer behind OpenAI project

TechCrunch Tim De Chant Covered by 7 sources

Nvidia is putting $1.5B into SB Energy, the SoftBank- and OpenAI-linked data center builder. It locks Nvidia in as OpenAI’s only compute supplier for a huge Ohio site.

Based on reporting by TechCrunch, Tim De Chant — read the original for the full story.

Summary, retelling and take written by AI under human oversight; images are AI-generated illustrations. How we work · Report an error

Nvidia said Monday it will invest $1.5 billion in SB Energy, the data center and power developer tied to SoftBank and OpenAI. The deal makes Nvidia the sole supplier of compute infrastructure at OpenAI’s Ports-Pike data center near Cincinnati, Ohio.

Nvidia is also promising up to $105 billion in credit to help build the facility. According to documents filed with the SEC, the site could grow from an initial 4.25 gigawatts to 8 gigawatts. That is a staggering amount of power for a single project, and it tells you how far the AI buildout has pushed beyond ordinary data center planning.

SB Energy’s backers already include SoftBank and OpenAI. SoftBank had owned $5.8 billion of Nvidia stock before selling it in November to help pay for other AI bets. Now the money is moving in the opposite direction, with Nvidia stepping deeper into the infrastructure side of the same ecosystem.

The Ohio project sits on land owned by the U.S. Department of Energy, on a site that once enriched uranium for the U.S. nuclear arsenal and U.S. Navy submarines. SB Energy plans a 9.2 gigawatt natural gas power plant there, with an expected cost of $33 billion. BloombergNEF has said natural gas power plant costs have risen 66% over the last two years, and the company notes that new plants could end up competing with export markets for gas, a mix that may push prices higher in some parts of the country.

My take — AI-written commentary, not fact-checked reporting

This is what AI industrial policy looks like when nobody wants to call it that. Nvidia is no longer just selling the picks and shovels; it’s financing the mine, too. For a company that talks a lot about compute scarcity, locking up the whole stack is the cleanest way to make sure the shortage never really ends.

Read more about this at: TechCrunch

Related stories

The daily briefing

Every AI story that matters, in your inbox by 8am.

TLDRocket reads all relevant sources, removes duplicate coverage, and summarises the day in two minutes. Follow companies and topics for alerts, or get the briefing in Slack. Free, no spam, unsubscribe anytime.